A cable drum on a site floor is not a lifting plan. It is a load with a weight, a center of gravity, a minimum bend radius, and a route that must be controlled from the first pull to the final tie-off. For most electrical contractors, a safe electric cable lift is not just a hoist with enough tonna...
Moving a loaded cart between two levels is one of those jobs that looks simple until someone has to do it by hand. A pallet of parts at ground level, a service counter 1.2 metres up, a mezzanine that needs restocking twice a shift: these are the situations where an elevator cart earns its place. Th...
Two people, one 2.4 m sheet of 18 mm MDF, and a dolly rated at 150 kg. On paper the numbers work. In the aisle, the sheet starts to lean because the backrest stops at 1.1 m, the front castor jams on a 15 mm expansion joint, and the load ends up dragged across the floor. That gap between the label a...